The package design includes a fully assembled enclosure incorporating the gas generator, power turbine, inlet plenum, lube system, and exhaust stack. These factory-assembled modules allow the FT8® SWIFTPAC® power plant to generate power in less than 30 days after arriving on site. The FT8® SWIFTPAC® gas turbine package is also available in a combined-cycle configuration.
BENEFITS
– Best-in-class, part load efficiency
– Reduced site setup time
– Lower site cost
– Less expensive shipping
– Reduced field flushing
– Ease of transportation and relocation
– Prefabricated piping needs no field welding
– Decreased site labor
– Standard and repeatable manufacturing process
– Standard and repeatable installation process
– Pre-assembled and tested
– Reduced field inventory
– Ease of engine checkout and maintenance
– Operating flexibility
– Minimal field wiring terminations utilizing quick-disconnect cables
PRODUCT FEATURES
– Factory-assembled modules
– Integrated lube oil system
– Factory-tested, quick-disconnect cables
– Prefabricated field piping
– Factory-flushed lube oil system
– Combined gas turbine and exhaust enclosure
– Factory checkout
– Simple, flat foundation with minimal embedments
– Compact layout
SCOPE OF SUPPLY
Gas Turbine Package
– Two (2) aero-derivative engines (30 MW each)
– Gas generator (GG8-3 core engine)
– Power turbine
– Diffuser
– Collector box
– Exhaust transition
– Fabricated gas turbine base and mount assembly
– Coupling connecting power turbine and generator
– Hydraulic starting motor
– Ignition system
– Off-line compressor, internal water wash system
Electrical power : 50 MW…100 MW, 20 – 50 MW
Technology : gas, turbine
Reviews
There are no reviews yet.