The MOBILEPAC® gas turbine package utilizes the FT8® engine and offers 30 MW of movable power. Utilizing the proven SWIFTPAC® gas turbine package technology, this package is designed to provide quick, reliable power and is especially useful in emergency situations.
The MOBILEPAC® gas turbine package design includes two trailers. The first contains the gas turbine, electric generator, exhaust collector, diffuser, and engine lube oil system. The second trailer carries the 15 kV switchgear, control system, operation panel, protective relays, batteries and charger, motor control center, and the hydraulic start package. A pre-commissioned MOBILEPAC® gas turbine package can be driven to a site and begin generating power in nine days or fewer.
BENEFITS
– Environmentally compatible
– Dual fuel/dual frequency
– Optional black start capability
– Flexible trailer siting
– Highway compatible
– Remote operation
– Three-point support and structural rigidity to maintain generator alignment
– Ready for emergency power within one day (site ready and previously commissioned)
PRODUCT FACTS
– Output (kW): 30,941
– Base engine: FT8® unit
– Number of trailers: Two
– Noise: 95 dBA at one meter
– NOx/CO: 50/100 mg/m3
– Grid: 50 or 60 Hz
– Fuel: Liquid or Gas
– Installation: Nine days or fewer
SCOPE OF SUPPLY
Power Trailer
Gas Turbine Package
– Gas generator (GG8-3 core engine)
– Power turbine
– Diffuser
– Collector box
– Exhaust transition
– Fabricated gas turbine base and mount assembly
– Coupling connecting power turbine and generator
– Hydraulic starting motor
– Ignition system
– Off-line compressor internal water wash system
– Lube oil system
Motor type : gas, turbine
Phase : three-phase
Portability : trailerable
Frequency : 50 Hz, 60 Hz
Fuel System : mechanical fuel injection
Applications : emergency
Power in kVA : Min.:
Reviews
There are no reviews yet.