Portable on-line partial discharge measurement and monitoring system
MONTESTO 200 is a portable, two-in-one solution that enables you to perform both on-line partial discharge (PD) measurements and temporary on-line PD monitoring: It can be used on various medium-voltage and high-voltage electrical assets under load to assess insulation condition. You can use the IP65 rated MONTESTO 200 both indoors and outdoors. Automated software features enable users to quickly and reliably identify and locate signal sources.
Key features:
– Two-in-one solution for on-line PD measurement and temporary PD monitoring
– Compact and lightweight for easy transport
– Designed for indoor and outdoor use
– Built-in computer for continuous, long-term data collection and archival
– Web-based interface for convenient remote setup and data access
– Automated software features for user-friendly data analysis and reporting
Applications:
On-line partial discharge measurements:
– Clarify asset insulation issues within the warranty period
– Periodically check asset insulation condition state
– Identify assets that require immediate intervention
Temporary on-line partial discharge monitoring:
– Observe assets at risk over extended periods of time
– Identify assets that require permanent monitoring
– Plan maintenance and investment based on asset condition
Type : power, voltage
Applications : measurement, device, remote control, transformer
Configuration : portable, compact
Interface : IP65
Other characteristics : continuous, remote, online
Reviews
There are no reviews yet.