Project, Assembly and Starting Operation
Volume of Delivery
Basic unit
• 1 basic unit with socket (3 poles) for the voltage supply, socket (5 poles) for the conductor rail connection and 2 pc support brackets.
• 1 interface
• 1 pair of optical fibers pre-manufactured
Please verify immediately if the material has been delivered
completely. The relevant document is the advice note.
Further Information
see instruction manual BAL0512-0001-E
Personal Security
Please consider the following topics:
• Switch off all units/machines/systems that are affected by the assembly. Disconnect these units/machines/systems from the power supply if required.
• Control the correct operation of the safety systems (e.g. emergency stop buttons)
• Install warning signs if required, to avoid starting the operation unintentionally.
• A system must only be programmed and configured while it is not in operation!
• When starting the operation make sure to apply a voltage of ±70V on the data cables!
• After having completed the mounting/repair works, carry out a test run of the systems and check the correct operation of the safety systems!
• Only release systems that work without any fault!
• We assume that you are familiar with the appropriate knowledge of mechanics and electricity!
• When starting the operation make sure to apply a voltage of ±70V on the data cables!
• After having completed the mounting/repair works, carry out a test run of the systems and check the correct operation of the safety systems!
• Only release systems that work without any fault!
• We assume that you are familiar with the appropriate knowledge of mechanics and electricity
Options : for charging
Reviews